Monday, February 21, 2022
Monday, January 24, 2022
Swim Spa Pad
The pad for the swim spa was poured today with exposed aggregate concrete to match the porch concrete.
Friday, December 3, 2021
Work on the Swim Spa
In an effort to help get this project going, Sue and I started doing some of the portions that we could:
1. Remove fencing where the spa concrete pad will go.
2. Install fencing needed to retain the dogs in the dog pen.
3. Design a plan and start constructing a method for the front fence/gate to be removed and reinstalled.
4. Reroute two sprinklers and drip line located in the spa pad concrete pad area between the existing pad and curb to outside of the curb.
Friday, October 22, 2021
Saturday, October 9, 2021
Chase Update
Since Chase has not been evaluated for our doggie daycare place we took Chase with us when we visited the coast at Crescent City. Chase later got to visit the Trees of Mystery. He didn't seem to mind the gondola for the SkyTrail.

















