Tuesday, June 9, 2015

Shop Work


 MPH's new home

 "Qualgeist" clock

Stude clock
 
 Aluminum threshold test fit

 Outside corner

 Walter. This sucker pumps up to 200 PSI and can put out 5 CFM at 90 PSI. Also oiless

 Garage door insulation installed



 Left over floor "wood"

Left over garage door insulation

Friday, June 5, 2015

Moving into shop office

Still a bunch to do but finally moving in. Got satellite working and wireless router connected to the house router so we are all on the same interwebs. Put down cheap fake hardwood but since it costs only $00.59 a square foot, I figure I can just replace it went it gets ratty...
















Sunday, May 31, 2015

Move update


 Shop looking down Studebaker Lane.


Madrone leaning on and growing into another Madrone

 Bugs in the upstairs tub.

Shop diamond plate baseboard
 Cityfied Mayer munching on a raw bone.

 Selfie out mending fences

 Milo sunning himself

 Mondo moths

 
Installing hump



 #4 at the Haul


 Mr. Potatoe Head from Brian Dahl

 Milo sunning himself on the stairs

 Fog on the mountain
 Scotty birdhouse

 MPH gets temp tags

 Taking the trash down

 More mending fences

 Inside shop window shelf

 Starting to arrange the sewing room

 Quilting frame partially put together

 Yum: Black Walnut Ice Cream, hand packed of course

 Sneaky snake

 Rosie went berserk today

 Looking at LED florescent replacement bulbs

 Shop office


Office, other end
 Shop space


 Shop space TV mount


 Quilt frame assembled

 Other side of sewing room

 Sue's office

 More office

Dog door training