MPH going up the hill to use the winch to pull trees.
Winch cable deployed on a big Madrone.
Made some Sourdough bread.
Excavator helping with tree removal
Say goodbye to the old 288 gallon LP tank
Amerigas taking away the old tank
Excavator preparing the wall
Footer forms and rebar in place
Cement truck ready to pour footer
Starting block lay. two courses of 12" then the rest 8"
Next: filling the block
Generator pad poured
Trees in bloom on the drive to National Forest trial for dog walking
Applying sealer
Generator arrives
Sue helped to get the generator centered on the pad
Slinging drain rock behind the wall
New 500 gallon LP tank arrives
And the hole digging starts
And it is in
Soaking the anode sack.
Back filling the wall
New gas line from tank to the generator with a "T" to the house
Electrical work starting. Here he is installing the automatic switch over box
Conduit from switch over box to generator
Switch over box
White Oak flooring has arrived to put down upstairs
Looking into storeroom/com closet
Store room, the one room with unfinished sheetrock
Fixing broken sprinkler system pipes that fell pray to the excavator
LP tank riser
Breaker panel prep. Panel on the left will be for generator circuits, one on the right will be for circuits not backed up by the generator