Saturday, December 14, 2024

Elevator

 We had a Stiltz elevator installed. Lower floor in the master bedroom and upper floor in the loft.

Cut a large hole in the ceiling to cut and reinforce joists



Upper level frame and plug fit testing

Removing upper level ceiling light

Joist work done and sheetrock done


Getting ready for install





First test


Hauling up a cabinet I modified for Sue to have an ironing table









Comes with a landline phone



Thursday, September 26, 2024

Master Bath Done

 

Wrought Iron forged hooks

Heated towel racks

Live edge floating shelves from a 200 year old Cedar tree on the property


Hickory bench from Etsy



Hickory vanity, wall mounted faucet zero edge Corian sink, vanity top and floors

edge lighted mirror w/light level setting and color setting w/anti-fog setting