The pad for the swim spa was poured today with exposed aggregate concrete to match the porch concrete.
Monday, January 24, 2022
Friday, December 3, 2021
Work on the Swim Spa
In an effort to help get this project going, Sue and I started doing some of the portions that we could:
1. Remove fencing where the spa concrete pad will go.
2. Install fencing needed to retain the dogs in the dog pen.
3. Design a plan and start constructing a method for the front fence/gate to be removed and reinstalled.
4. Reroute two sprinklers and drip line located in the spa pad concrete pad area between the existing pad and curb to outside of the curb.
The plan to make the two front gate posts removeable so that the spa can be brought in and removed in the future is to use this aluminum tube inside the cut posts. This tube will be squared up a bit with a 20 ton press and placed inside the posts spanning into the post underground and the above ground post. The post/tube will be fastened using bolts.
Old, now unused gutter drain pipe. This will be moved to the right to clear the new spa concrete pad
Friday, October 22, 2021
Saturday, October 9, 2021
Chase Update
Since Chase has not been evaluated for our doggie daycare place we took Chase with us when we visited the coast at Crescent City. Chase later got to visit the Trees of Mystery. He didn't seem to mind the gondola for the SkyTrail.
Subscribe to:
Posts (Atom)

















